How We Started People Protecting Poquito Bayou (PPPB)
I’m one of the founding members of People Protecting Poquito Bayou (PBBB). We were concerned about 40.83 acres of privately-owned land and its environment that was slated for residential development. It was a grass roots effort. We didn’t have a big budget. We didn’t have any collective expertise in challenging a residential development order. What we had was to do our best to challenge this development.
We didn’t know what the development order was. We had no idea on Okaloosa County Land Development Codes (LDCs) or Okaloosa County Comprehensive plans (COMP Plan). We dug into the LDCs and COMP Plan. We branched out into numerous directions and rabbit holes. Some were beneficial while others proved a waste of time.
Our first biggest issue was that the builder was D.R. Horton, a national home builder, who had a reputation for totally clear cutting on the property and building small, substandard houses. …
_edited.png)

Taking Action When Procedures Aren’t Followed in Accordance With the Construction Plans
We lost the battle with the proposed D.R. Horton Saltwater Landing Subdivision on 40 acres in our established neighborhood. We were surprised how fast D.R. Horton’s sub-contractor, Forestar Development Company, sprang into action. Within a week, crews were cutting down tall pines and hauling them off to a lumber mill. I had prepared concerned citizens on our People Protecting Poquito Bayou Facebook page what to look out for and who to report it to in a handout that was made available to them.
One of the first “violations” observed was the blockade at the end of North Drive had been moved and large trucks were entering and exiting the property on Tuesday, September 29th. I was notified around 2:14 PM from a concerned citizen.
I typed up an email to send to Ms. Shell, OC Growth Management Director, Ms. Ketchel, our County Commissioner and several other Okaloosa County Growth Management officials. Here’s the email:
Ms. Shell,
A concerned citizen had informed me that H & T Excavation is using the North Drive entrance (which is supposed to be closed off). Reports of trucks with trailers exiting the property heading down North Drive and onto Sharilyn Drive.
I was under the impression that the former asphalt plant entrance and the actual front entrance, across from Hillcrest Drive, will be the primary entry/exit for the construction site.
North Drive is a narrow street which might be challenging with two vehicles passing one another.
Thanks in advance.
V/R
Dave Hensley
People Protecting Poquito Bayou
Once I sent the email we drove around and eventually arrived at North Drive. We could see an Okaloosa County Vehicle at the end. We suspected it was Code Enforcement. A few minutes later, we were at the intersection of Hillcrest and Sunset Lane and noticed the same vehicle and the Code Enforcement Official was talking to H & T Excavation personnel. I suspect telling them not to use North Drive.
At 4:25 PM I received the following email from Ms. Shell, OC Growth Management Director:
Mr. Hensley,
Thank you for bringing this to our attention. Code Enforcement staff did visit the site today and witnessed a construction vehicle parked on North Drive. He was informed he cannot use this; North Drive is an emergency access only on approved plans intended for the benefit of the new residents only in case of an emergency.
We will continue to monitor the situation, let us know if they continue to use this entrance/road.
Kristen Shell, AICP, MEng
Director, Growth Management Department
Okaloosa County
At 4:55 PM, I got an additional email from Ms. Martinez, OC Growth Management:
Good afternoon, Mr. Hensley,
To add up on the email below from Ms. Kristen Shell – the area of the property directly connecting to North Drive will be dedicated as Public ROW and will only be used for emergency access. I went to the project site this afternoon together with Officer Chris Moody with the Code Enforcement Division and advised the contractor not to park his truck on the North Drive ROW. I also advised him that the installation of a silt fence along the perimeter of the property is required. Officer Moody will check the project site tomorrow to make sure that the contractor is not parking on the North Drive ROW.
Thank you for bringing this matter to us.
Marissa L. Martinez
Senior Planner, Growth Management Department
Okaloosa County
Here are some takeaways from this situation:
1. Fully understanding the Saltwater Landing construction plans helps in determining if there’s a potential issue. I recalled reading somewhere in the construction plans a few years ago, the primary construction entrance will be at Hillcrest Drive and Sunset Lane.
2. This is our first major issue where we got Okaloosa County Growth Management involved in an issue, they had direct oversight of. This isn't the last time this will happen.
3. I appreciated Okaloosa County Growth Management's quick response and more importantly their follow up with an important matter.
4. Growth Management appreciated our email and recommended additional notification if this situation happens again.
5. Ms. Martinez directed H & T Excavation to install the silt fence along the perimeter.
6. This site is on Okaloosa County's radar. I suspect they may be driving by periodically to check on things.
Note: Crews were installing the silt fence on Friday, October 2nd.